Results
Savings estimate with ConcR
[concr-result field=41] % construction time
[concr-result field=99] € construction cost
Details of our calculation
Using ConcR sensors will allow you to proceed to the next casting within [concr-result field=61] days, instead of [concr-result field=57] days.
This means that you will be able to complete your structural works within [concr-result field=62] days (rather than the planned [concr-result field=39] days). This results in a total saving of [concr-result field=63] construction days.
To say it in a different way: You would shorten your construction time by [concr-result field=41]%!
Moreover, you will be able to save your overall construction costs by deploying ConcR sensors. We estimate that your project will require a total of ca. [concr-result field=60]m² of form works.
If you deploy our sensors, you would optimize your casting period and would only need a total of ca. [concr-result field=64]m² of formwork, saving you over 30%.
If you rent your formwork at the current market average of 0.45 €/m², you would have to pay [concr-result field=91] EUR in total. Using our sensors, you would lower these total costs to [concr-result field=92] EUR, saving you [concr-result field=93]%, which are [concr-result field=65] EUR of the total rental cost.
If you buy your formwork at 450 €/m², then your project will have cost you [concr-result field=94] EUR. Your potential saving would amount to [concr-result field=96]% and would lower your ownership cost of the formworks to [concr-result field=95] EUR.
In addition to saving on the overall cost, the shorter construction period also has an indirect influence on other variables that are time-dependant. If the total cost of your project amounts to [concr-result field=89] EUR and 15% of that falls on indirect costs, you could expect saving [concr-result field=90] EUR due to earlier project completion.
In total, ConcR has the ability to save [concr-result field=97]% of your total project construction cost, if you rent your formworks. In case you own your own formworks, it has the capacity to save you [concr-result field=100]%.
Our recommendation:
Pro
For bigger projects
35
per measurement
-
Number of devices: 8
-
Measurements during the contract period: 480
-
Contract period: 12 Months
-
Total price for 12 Months: 16200€
If you have any questions or would like a consultation, please fill in the fields below. We will get back to you shortly.